KPI-1

ACHO-DIKE IKECHUKWU UZOAMAKA

AGPC Production Engineering Trainee

2022 KPI

KPI 1: Identify 80% of all GPS and Baker Hughes Modules

Baker Hughes Modules

S/N

Equipment

Equipment Tag No

Criticality

1

2 Nos Gas Turbine Generators

1A-7001 A/B

High

2

2 Nos Waste Heat Recovery Unit (WHRU) Package

1A-5601 A/B

High

3

3 Nos LPG Loadout Pumps and Motors (Centrifugal) (2N+1)

1P-3901 A/B/C

High

4

2 Nos Condensate Booster Pumps and Motors (Centrifugal)

1P-2401 A/B

High

5

3 Nos Condensate Export Pumps and Motors (Centrifugal) (Normal Ops N+2; Tank Evacuation 2N+1)

1P-2402 A/B/C

High

6

2 Nos Produced Water Transfer Pumps and Motors (Centrifugal)

1P-4301 A/B

Medium

7

1 Nos Condensate Tank Water Drain Pump and Motor (Centrifugal)

1P-4303

Medium

8

2 Nos Hot Oil Circulation Pumps and Motors (Centrifugal)

1P-5701 A/B

High

9

2 Nos Emergency Diesel Generator

EDG-7001 A/B

High

10

2 Nos Flash Gas Compressor Package (Reciprocating)

1A-3301 A/B

High

11

2 Nos Stabilizer Off Gas Compressor Package (Reciprocating)

1A-3501 A/B

High

12

3 Nos x 165 MMSCFD Sales Gas Compressor Package (Centrifugal) (2N+1)

1A-3401 A/B/C

High

13

Condensate Product Cooler – 1 (Air Cooler)

1E-2803

High

14

Gas Feed Cooler (Air Cooler)

1E-3001

High

15

C3/C4 Product Cooler (Air Cooler)

1E-3707

High

16

2 Nos C3/C4 Splitter Condenser (Air Cooler)

1E-3706 / 2E-3706

High

17

2 Nos C3/C4 Splitter Condenser (Air Cooler)

1E-3704

High

18

Hot Oil Trim Cooler (Horizontal Air Cooler)

1E-5701

High

19

2 Nos De-Butanizer Condenser (Air Cooler)

1E-3703 / 2E-3703

High

For GPS Modules and complete list, Click Here To Download This Excel File